
Could Your Emissions Reduction Project Qualify for TERP Funding?
-The Texas Emissions Reduction Plan (TERP), administered by the Texas Commission on Environmental Quality (TCEQ), provides grants and rebates to…

Understanding Phase I and Phase II Environmental Site Assessments (In Plain English)
-When people buy a house, they almost always get a home inspection. They want to know if there are hidden…

Freshwater Mussel Surveys for Project Compliance
-The 2026 freshwater mussel survey season is upon us! If your project could potentially impact federal or state-listed freshwater mussels,…

Preparing for the 2026 MSGP Renewal in Texas
-The Texas Commission on Environmental Quality (TCEQ) is renewing the Texas Pollutant Discharge Elimination System (TPDES) Multi-Sector General Permit (MSGP),…

Innovative Environmental Risk Management for Aerospace Facilities: EDGE’s Proven Approach
-Aerospace manufacturing and other large manufacturing and chemical facilities face unique environmental risks due to their complex processes and long…

Preparing for an Environmental Protection Agency FRP or SPCC Inspection
-Facility Response Plan or Spill Prevention, Control, & Countermeasure inspections can be announced or unannounced. Either way, it is critical…

Impact of Condensable Particulate Matter (CPM) on Air Permitting and Good Practices for Avoiding Stringent Operating Restrictions
-Increasingly stringent PM2.5 standards are creating new challenges for industrial facilities navigating air permitting requirements. As facilities evaluate compliance with…

Now Available: EPA Releases TSCA Inventory Update #7
-The U.S. Environmental Protection Agency recently issued Update #7 to the public Toxic Substances Control Act Inventory (TSCA). This biannual…

EPA Proposes Major Changes to Clean Air Act Risk Management Program Requirements
-The U.S. Environmental Protection Agency (EPA) has issued a proposed rule that could significantly modify Clean Air Act Risk Management…

Amendment Reconsideration on Clean Water Act (CWA) Hazardous Substance Facility Response Plans (FRPs)
-Following a 2025 Executive Order, the EPA published an Advanced Notice of Proposed Rulemaking (ANPRM) on February 18, 2026. The…
Author archive for Edge Engineering
EDGE Engineering LLC > Articles by: Edge Engineering











